System_Status: Operational
Fiber-Optic
Infrastructure & HDD
Live_Feed
Field Action
Executing precision bore paths beneath active transit corridors.
01_Engineering_Core
Strategic Methodology
02_Operational_Scope
Utility Integration
FLEET_COUNT: 03 UNITS
Goodeng GD320C-LS
Pullback Force320 kN
Max Spindle Torque12,000 Nm
Engine Power Output153 kW
SITE_CAPABILITY
Geophysical Mapping
Subsurface SoilGrade A-D
Max Boring Length450 Meters
Guidance Accuracy+/- 2.0%
Archive_Project_01
TNB 4-Way Installation
Deployment Length380m
Archive_Project_02
TNB 8-Way, 2-Circuit
Deployment Length510m
Archive_Project_03
PPU Jalan Song Ban Kheng
Deployment Length1200m
Archive_Project_04
TIME DOTCOM Fiber Link
Deployment Length680m
Network_Access_Protocol
Initialize Global Project
CGST Cahaya is committed to engineering excellence. Our team provides comprehensive site surveys, soil analysis, and HDD feasibility studies to ensure your infrastructure project is completed on time and within specifications. Initialize our deployment core today.







